License
The company owns a License for production of electrical energy No L-341-
01/04.10.2010, issued by the State commission for energy and water regulations – a necessary  and obligatory condition for the realization of this type of production.
 

Republic of Bulgaria


State Commission for Power and Water Regulation


LICENSE
For production of electrical power
№L-341-01/04.10.2010

Issued by the State Commission for Power and Water Regulation on the grounds of art. 39-1-1 in connection with art. 21-1-1 from the law for the energ (promulgated in the State Gazette № 107/2003, modified with State Gazette 18/2004), modified with State Gazette18/ and 95/2005, modified with State Gazette 30, 65 and 74 /2006, modified with State Gazette49, 55, and 59/2007; modified with State Gazette 36, 43 and 98/2008, modified with State Gazette 35, 41, 42, 82,  and 103/2009, modified with State Gazette № 54/2010) and with its resolution № L-341 from 04.10.2010

Of the Limited Liability Company
“STROY INVEST SREDETS”

With head office and address of management Republic of Bulgaria, Sredets city, 8300, region of Burgas, municipality of Sredets, 1A Lilyana Dimitrova Str
ID № 200355314
For the duration of 25 twenty-five years, which shall be realized in accordance with the conditions as provisioned in the directive part of the present license and the enclosures thereto.


President of the State Commission for Power and Water Regulation:
Angel Semerdzhiev, illegible signature  and seal